(J) Floating Floor System (2000-Now)
 

Projects for which Zemac Engineering were involved in the calculation, design, supply & install of the vibration control treatment.

 

1

Job Name

:

7-9 Minden Avenue (2001)

 

Client

:

Gammon

 

Nature

:

Design, supply and install floating floor construction at lift plant room

       

2

Job Name

:

7 Lion Rock Road (2001)

 

Client

:

Gammon

 

Nature

:

Design, supply and install floating floor construction at lift plant room

       

3

Job Name

:

Les Saisons (2001)

 

Client

:

Dragages

 

Nature

:

Design, supply and install floating floor construction at lift plant room

 

 

 

 

4

Job Name

:

Tseung Kwan O New TVB City (2001-2002)

 

Client

:

Hong Kong TVB

 

Nature

:

Floating floor design and construction

 

 

 

 

5

Job Name

:

KIL 11122 Hau Man Street (2002-2003)

 

Client

:

Wing Sum Construction & Engineering Co., Ltd.

 

Nature

:

Floating floor design and construction

 

 

 

 

6

Job Name

:

Leighton Hill Link Road (2003)

 

Client

:

Yee Fai Construction

 

Nature

:

Floating floor design and construction

 

 

 

 

7

Job Name

:

A&A Works at No.9 Wang Kwong Street, Kowloon Bay (2003)

 

Client

:

Yuen Cheong Construction Co., Ltd

 

Nature

:

Floating plinths

       

8

Job Name

:

Ap Lei Chau 128 Residential Development (2003)

 

Client

:

Sun Hung Kai Properties Group

 

Nature

:

Floating slab design and construction

       

9

Job Name

:

Yuen Long Residential Development <Yoho Town> (2003)

 

Client

:

Sun Hung Kai Properties Group

 

Nature

:

Floating slab design and construction

       

10

Job Name

:

Airport Rainway Kowloon Station Development KIL 11080 <Phase III> (2003)

 

Client

:

Sun Hung Kai Properties Group

 

Nature

:

Floating slab design and construction

       

11

Job Name

:

Kwun Tong 750 Office Development <創紀之城第5期> (2003)

 

Client

:

Sun Hung Kai Properties Group

 

Nature

:

Floating slab design and construction

       

12

Job Name

:

Lung Po Road Residential Development (2003)

 

Client

:

Sun Hung Kai Properties Group

 

Nature

:

Floating slab design and construction

       

13

Job Name

:

Office Development at NKIL 5877 Kowloon Bay (2003)

 

Client

:

Kerry Properties Ltd.

 

Nature

:

Floating slab design and construction

 

 

 


 
[ Back to Top ] [ Back to Home ]

 

Copyright 2003 Zemac Engineering Co., Ltd. www.zemac.com
Last updated in
February 2003